CALL FOR EXPRESSIONS OF INTEREST
Mount Beulah Baptist Church
854 Weymouth Falls Road, Weymouth Falls, Nova Scotia
Phase 1 – Winter Stabilization & Building Protection
Weymouth Falls Community Land Trust (WFCLT), in collaboration with zzap architecture + planning and BMR Structural Engineering, is seeking expressions of interest from qualified contractors to undertake the initial stabilization and weather protection of the historic Mount Beulah Baptist Church in Weymouth Falls, Nova Scotia.
This work represents the first phase of a broader building rehabilitation project, with an immediate focus on protecting the existing structure from further deterioration through the winter months and supporting the drying of existing interior building materials. The intention is to preserve as much of the existing historic building fabric as possible while preparing the building for future rehabilitation.
Preliminary Scope of Work
The initial phase will focus on temporary building envelope repairs, weather protection, and selective removal of interior finishes.
- Building Envelope Stabilization & Weather Protection
- Building envelope repairs: Identify and temporarily patch holes, openings, and deteriorated areas of the existing building envelope using plywood or other suitable materials.
- Temporary roof waterproofing: Supply and install a durable, weather-resistant membrane system over the compromised roof to minimize further water infiltration. The temporary assembly is intended to remain in place for up to two years while the broader rehabilitation project advances.
- Temporary exterior wall protection: Where required, supply and install a durable, vapour-permeable, weather-resistant building wrap suitable for extended exposure, with manufacturer-confirmed performance requirements.
- Installation and securement: Provide appropriate fastening, membrane overlaps, sealed seams, and detailing at openings, penetrations, and transitions to resist wind and water infiltration. Additional mechanical securement, such as nominal 1 x 4 wood battens at approximately 24 inches on centre, is anticipated to address wind uplift, subject to confirmation of the fastening strategy and existing substrate conditions.
- Moisture management: Maintain appropriate drainage and drying potential within the existing building assemblies to support the drying of interior building elements.
The proposed membrane materials, fastening details, and installation approach must be suitable for the intended temporary exposure period and existing building conditions, and will be subject to review by the project consultants.
- Selective Interior Finish Removal & Heritage Protection
- Selective removal: Carefully remove designated interior finishes and materials to expose existing building components, facilitate drying, and allow further assessment of the structure.
- Historic tin ceilings: Carefully dismantle and salvage existing decorative tin ceiling panels where removal is required. Materials are to be handled with care, documented, and stored in a secure, dry location for potential reuse during future rehabilitation.
- Stage preservation: Every effort is to be made to retain and protect the existing stage in its current configuration. Any required removal, alteration, or stabilization will be determined based on conditions encountered and in consultation with the project team.
- Existing heritage elements: Protect existing historic materials and architectural features identified for retention. Removal and disturbance of existing materials are to be minimized wherever possible.
- Site cleanup: Remove construction debris, retain salvaged materials as directed, and leave the building and surrounding site in a safe and secure condition.
The extent of interior removal will be confirmed following review of existing conditions, with appropriate safety and hazardous-material precautions established before work proceeds.
- General Requirements
These measures are intended as temporary stabilization and protection for a period of up to two years while the broader rehabilitation project advances. Permanent repairs and restoration will be undertaken as part of subsequent project phases.
The final scope, materials, installation details, and extent of repairs and removals will be reviewed during the mandatory site visit and confirmed before pricing.
Mandatory Contractor Site Visit
Date: Saturday, October 31, 2026
Time: 2:00 PM
Location: Mount Beulah Baptist Church, 854 Weymouth Falls Road, Weymouth Falls, Nova Scotia
All contractors interested in submitting pricing for this work are required to attend the mandatory site visit.
The visit will provide an opportunity to:
- Review existing building conditions, including supervised access to the interior.
- Discuss the proposed temporary stabilization, weather protection, and selective interior removal.
- Identify historic building elements requiring protection or salvage.
- Review site access, installation considerations, safety requirements, and the anticipated construction schedule.
- Ask questions prior to the preparation of pricing.
Personal protective equipment (PPE) is mandatory, including CSA-approved safety footwear, hard hats, safety glasses, and high-visibility clothing.
Interior access will be supervised and subject to existing site safety conditions. All applicable federal and provincial occupational health and safety requirements must be followed.
Project Schedule
The stabilization work is time-sensitive, with the objective of securing the building against further weather-related deterioration before winter.
Contractors should be prepared to mobilize as soon as possible following confirmation of the scope and award of work.
Interested contractors are asked to indicate their earliest available start date and estimated construction duration.
Expressions of Interest
Weymouth Falls Community Land Trust is rooted in and accountable to the historic African Nova Scotian community of Weymouth Falls. We welcome participation from local and regional contractors with experience in building renovation, envelope repairs, structural stabilization, and heritage rehabilitation.
As part of our commitment to building community capacity, leadership, and meaningful employment opportunities, qualified contractors and tradespeople from Weymouth Falls and surrounding African Nova Scotian communities are particularly encouraged to express their interest.
Interested contractors are asked to provide:
- Company name and primary contact information.
- Brief description of relevant construction or rehabilitation experience.
- Confirmation of attendance at the mandatory site visit.
- Earliest anticipated availability and estimated duration to complete the work.
Following the site visit, additional scope information and pricing requirements will be shared with participating contractors. Attendance does not guarantee an award of work.
Please confirm your interest and attendance by: 11:59 PM on Thursday, October 29, 2026.
Contact: Shekara Grant, shekara@weymouthfalls.ca, 902-841-1293